Background 

The smes have growth quickly with small scale as the economy developed. Consequently,the industrial buildings and industrial parks is booming all over the country. The smes value the returns, period and effect with the low investment while conceiving the IP video monitor solution.Meanwhile, they pay much attention to if the system is helpful for the company development and the investment guarantee either.

On the basis of the reality, what the smes exactly need is the reasonable-cost products to offer high quality monitoring and the seamless connection. They select with the principle of “High value but low cost”. Secondly, the smes look forward to a real-time, rapid and intelligent unified management. Plus the solution is supposed to cooperate on the long-term flexible development of the smes for averting the repeated investment and the costly maintenance.

 

Demands Analysis   

Because of the high floor and lots of obstructions,using the wireless bridge relay mode and transferring the signal to do the no blind spot monitoring and wiring.

Set an alarm system to monitor the entrance,exit and the essential area,prevent stealing from the criminals,guarantee the safety of staff’s life and property.

Make full use of the cloud platforms to do the remote controlling on Internet.

 

System Topo Map

QQ图片20160319121503

 

System Design

QQ图片20160319121545

1.The video monitor system should follow the principle of advanced technology, complete function,s table performance, cost saving. And it’s necessary to consider the factors as construction,maintenance and operation for the followed development, extension and reforming. The system is expected to be systemative, finished and comprehensive, came out with science, rationality and operability. Install the HD cameras to entrance and exit, the stage, hallways, offices and financial rooms etc.

2.Back-end management part:A platform management server in proprietor’s office(includes centralized management module, streaming storage module, decoding display module, forward service module).The terminal is made of 4 telecommunication level monitors.

3.Transmission part: Install the CCTV control system directly on basic of the good original networks, which can low cost and reduce wiring.

 

 

Receive parts signal only on the same floor  

Because of the high floors and lots of barriers,parts of signal can be received only on the same floor.It’s better use relay mode to transmit the signal but will reduce the bandwidth to half. It means that three 720P cameras left from six after the relay.

QQ图片20160319121620

 

 

Devices of Solution

QQ图片20160319121709

0 条评论

发表回复

Avatar placeholder